Turn unused space into income-generating ADUs & beautiful additions

Most Massachusetts Property Owners Are Sitting on a Missed Income Opportunity and Don’t Even Know It

Because of a new Massachusetts ADU law, your property may now allow a legal second living unit — rental income, added value, and long-term flexibility — without rezoning.

But here’s the problem:

Most homeowners and property owners still think the old rules apply.
And while they wait… they miss out.

Fast ADU Feasibility Review

Share a few details and we’ll tell you what’s possible on your lot, typical costs, and timeline—no obligation.

Or call now: +1-781-420-2356

Average ADU projects start in as little as 4–6 weeks after approval.

What You May Be Missing Right Now

  • Monthly rental income your property could already support

  • Increased property value buyers pay more for

  • Space for family that avoids future housing costs

  • Flexibility that protects you long-term

The law changed.
Most homeowners didn’t.

Before You Assume Your Property Has No Additional Value…

  • Before you dismiss the idea.

  • Before you leave income on the table.

  • Before you assume your town won’t allow it…

Find out what your property actually qualifies for.

What Changed in Massachusetts (2024 ADU Law)

Massachusetts passed a new law that quietly changed the game for homeowners.

In many situations:

  • ADUs are now allowed by right

  • Special permits may no longer be required

  • Towns can’t outright ban ADUs

  • Homeowners gained more flexibility than ever before

But here’s the part no one tells you:

The law made ADUs easier, not automatic.

Design, setbacks, utilities, size limits, and local interpretation still matter.
Get one thing wrong, and your project stalls.

Why Most ADU Projects Fail Before They Start

We see the same mistakes over and over:

  • Designing before checking zoning reality

  • Hiring builders who don’t understand the law

  • Paying architects for plans that won’t get approved

  • Assuming “by right” means “no rules”

  • Underestimating how towns interpret the law

A denied permit isn’t just frustrating and it’s expensive.

Months lost.
Money wasted.
Momentum gone.

Who This Is For

This page is for homeowners and investors who:

  • Own property in Massachusetts

  • Are considering an ADU or home addition

  • Want it done legally, correctly, and professionally

  • Care about long-term value, not shortcuts

This is not for:

  • DIY permit guessing

  • Lowest-bid shopping

  • Rushing into design without clarity

Why PS3 Remodel, Design & Build Is Different

Most contractors build first… and figure things out later.

We don’t.

PS3 is a design-build firm that understands:

  • The Massachusetts ADU law

  • Local zoning interpretation

  • Permit realities

  • Structural and design constraints

  • Construction execution

Everything is handled under one roof:

  • Feasibility review

  • Code-aligned design

  • Permit coordination

  • Construction

One team. One plan. One accountable outcome.

ROI: How ADUs & Additions

Create Real Income

  • Monthly Rental Income - A legal ADU can generate predictable monthly cash flow and help offset mortgage costs.

  • Increased Property Value - Homes with legal, code-compliant ADUs often appraise higher due to income potential and flexibility.

  • Built-In Flexibility - Even if you don’t rent immediately, ADUs provide:

    • Housing for aging parents

    • Space for adult children

    • Future rental options

    Flexibility is a form of financial leverage.

Return on Investment.

Not just resale value — but monthly income, flexibility, and long-term leverage.

Why ROI Starts Before Construction

  • Poor early decisions can:

    • Limit rental potential

    • Reduce appraised value

    • Increase costs

    • Delay income

  • Smart feasibility planning:

    • Maximizes usable square footage

    • Reduces approval risk

    • Aligns design with income goals

    • Protects your investment

Here’s the truth most contractors won’t tell you:

ROI is decided at the planning stage — not after the build

Type of ADU and Additions

Meet the Builder Behind

the Work

Paulo Santos has been working in design and construction since the age of 16.

That’s over 30 years of hands-on, real-world experience.

He didn’t learn construction from shortcuts or theory.


He learned it:

On job sites

Through real projects

By solving real problems

By being accountable for the outcome

Experience like this doesn’t show up in proposals.
It shows up when problems are avoided entirely.

ADUs and additions are not beginner projects.
They demand experience — not guesswork.

The PS3 ROI-First Approach

At PS3, we don’t just ask:

“Can this be built?”

We ask:

“Does this make financial sense?”

Every feasibility consultation considers:

Income potential

Approval risk

Long-term usability

Resale impact

Cost vs return alignment

Because building something that technically works — but financially underperforms — is still a loss.

services

Detached & attached ADUs

Garage conversions, backyard cottages, over-garage units, and attached ADUs optimized for rental income or multi-generational living.

  • Concept & architectural design
  • Structural & MEP engineering
  • Permit-ready construction documents

Home additions & expansions

Bedrooms, primary suites, second stories, and family rooms seamlessly integrated into your existing home.

  • Building Plans & space planning

  • Structural tie-ins & foundations

  • Interior finishes & fixtures

Design–build project management

One accountable team coordinating architects, engineers, subs, city inspectors, and materials to keep your project on track.

  • Transparent schedules & milestones
  • Weekly progress updates
  • Final walkthrough & punch list

Process

A proven 6-step path from idea to move-in

We’ve streamlined ADU and addition projects into a transparent, milestone-based system so you always know what’s next.

1. Discovery call

We discuss your goals, property, and budget, and confirm if an ADU or addition makes sense.

2. Site visit & feasibility

We evaluate access, utilities, setbacks, and zoning to confirm what’s allowed and the best placement on your lot.

3. Design & pricing

You review layouts, elevations, and finishes while we lock in a fixed project price and schedule.

4. Permits & approvals

We prepare and submit all drawings, respond to city comments, and secure the permits so construction can begin.

5. Construction & inspections

Our vetted crews build to plan while we coordinate inspections and keep you informed with weekly updates.

6. Turnover & Support

We complete the final walkthrough, address any punch list items, and provide documentation for insurance or rental listings.

Gallery

Recent ADU and home addition projects

See how local homeowners have turned garages, backyards, and unused space into high-value, livable square footage.

Modern backyard ADU with patio

Detached 1-bedroom ADU with vaulted ceilings and private patio.

Second-story home addition

Second-story primary suite addition with new roofline and balcony.

Garage conversion ADU interior

Garage conversion ADU with custom kitchenette and built-in storage.

Testimonials

Homeowners trust PS3 Remodel + Design with their biggest projects

From first walkthrough to final inspection, our team focuses on communication, craftsmanship, and clean jobsites.

5/5 average rating across recent projects.

Ask us for references and we’ll connect you with homeowners nearby.

“ADU and Additions handled our garage conversion from start to finish. They dealt with the city, tricky sewer tie-ins, and still finished on time. We have a beautiful rental that pays most of our mortgage.”

Maria & Jacob • Garage ADU

“We added a second-story primary suite and office. The team respected our budget, kept the house livable, and the finished space feels like it was always part of the home.”

Danielle • Second-story addition

“Their communication was the best we’ve had with any contractor. Weekly updates, clear milestones, and no surprise change orders.”

Priya & Arun • Backyard ADU

Our Refrences

LogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogo

FAQ

Common questions about ADUs and additions

Don’t see your question here? Ask it in the quote form and our team will respond within one business day.

How long does an ADU or home addition project usually take?

Timelines vary by scope and city, but most ADUs take 2–4 months for design and permits, followed by 4–6 months of construction. Larger additions can run 6–9 months. After your feasibility study, we’ll provide a personalized schedule with clear milestones.

Do you handle permits and work with the city?

Yes. Our team prepares the full permit set, submits it to the city, coordinates plan check comments, and attends any required inspections. You stay informed, but we handle the back-and-forth with building departments.

Can you work with my budget?

We start with your target budget and design toward it, presenting options at different finish levels. If an ADU or addition is not realistic within your budget, we’ll be upfront before you commit to a build contract.

Is financing available for ADU or addition projects?

Many clients use home equity loans or specialized renovation financing. While we’re not a lender, we can connect you with partners who understand ADU and addition projects and can walk you through options.

Will construction disrupt our daily life?

We plan access, staging, and work hours to minimize disruption. For detached ADUs, impact is usually limited to access paths and utility tie-ins. For additions, we phase work to keep as much of your home livable as possible and maintain clean, safe jobsites.

Check If Your Property Qualifies for an ADU

Tell us about your property and goals

Complete the form and we’ll follow up within one business day to schedule a quick call or on-site visit. No pressure, no hard sell—just clear answers and real numbers.

  • Typical response time: under 24 hours

  • Evening & weekend appointments available

  • Serving homeowners and property owners in the Boston local area.

Request your ADU or Addition Feasibility Review

Your information is kept private and used only to follow up about your project.

PS3 Build Remodel & Design

Design–build specialists focused on ADUs, garage conversions, and home additions for homeowners and property owners who want more space or rental income without the stress.

Contact

Phone: +1 781-420-2356
Address: 114 Cottage St, Boston, MA 02128
Hours: Mon–Fri, 8am–6pm

Service area: Local Boston and surrounding cities. Ask if we cover your address.

© 2026 PS3 Build, Remodel & Design All rights reserved.